Main process:

Sanitary wares Production Process

Raw material storage
  • 夢佳衛浴
Raw material weighing
  • 夢佳衛浴
Raw material ball-grinding
  • 夢佳衛浴
  • 夢佳衛浴
Design and mould making
  • 夢佳衛浴
Mud preparation and storage
  • 夢佳衛浴
  • 夢佳衛浴
Semi-auto high-pressure casting line
  • 夢佳衛浴
Semi-auto high-pressure cistern casting line
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Drying
  • 夢佳衛浴
Semi-finished products inspection
  • 夢佳衛浴
  • 夢佳衛浴
Glazing
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Loading & Firing
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Final products inspection (including cold processing ) all the qualified products are sent to the warehouse. Partial unqulified products will be refired and then reinspected again . If ok, then sent to the warehouse , If not , will be distroied.
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
COPYRIGHT ? 2018 MONGA ALL RIGHTS RESERVED Design By Weipai
代练网赚钱 安徽体彩十一选五一 黑龙江快乐十分遗漏 山西快乐10分下注 广西十一选五开奖预测 今日安徽快三走势图 盈富配资 新疆11选5一定牛 上海快三开奖结果全部 彩票预测神器软件 天天彩票选四最新开奖