Main process:

Sanitary wares Production Process

Raw material storage
  • 夢佳衛浴
Raw material weighing
  • 夢佳衛浴
Raw material ball-grinding
  • 夢佳衛浴
  • 夢佳衛浴
Design and mould making
  • 夢佳衛浴
Mud preparation and storage
  • 夢佳衛浴
  • 夢佳衛浴
Semi-auto high-pressure casting line
  • 夢佳衛浴
Semi-auto high-pressure cistern casting line
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Drying
  • 夢佳衛浴
Semi-finished products inspection
  • 夢佳衛浴
  • 夢佳衛浴
Glazing
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Loading & Firing
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
Final products inspection (including cold processing ) all the qualified products are sent to the warehouse. Partial unqulified products will be refired and then reinspected again . If ok, then sent to the warehouse , If not , will be distroied.
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
  • 夢佳衛浴
COPYRIGHT ? 2018 MONGA ALL RIGHTS RESERVED Design By Weipai
代练网赚钱 南粤风釆36选7基本走 山东11选5前三直一定 福彩欢乐生肖 河南快3遗漏一定牛 大盘股票指数 pk10滚雪球计划app 吉林十一选五开奖结果走势 新疆11选5前三走势图带连线 江西十一选五前三直选 体彩有网上投注平台吗